2026 Market Rate Chart (BDT)

Dhaka & all 64 districts
Work / ServiceTypical Cost

IPS / Inverter Checkup & Troubleshooting

Low backup, charging or overload diagnosis

৳500 - ৳700

New IPS & Battery Setup (existing IPS line)

DB connection and load testing

৳800 - ৳1,200

Dedicated IPS Line Wiring (per point)

Cable and casing materials extra

৳450 - ৳600 / point

Full 3-Room Flat IPS Wiring (labor)

Varies by concealed vs. surface casing

৳2,500 - ৳4,500

Distribution Board (DB) & MCB Upgrade

Breakers and switches extra

৳800 - ৳1,800

Instant Price Estimator

Tap tasks to estimate Electrical labour

  • Fan installation / servicing

    About ৳400

    0
  • Light or switch replacement

    About ৳300

    0
  • Socket / switchboard repair

    About ৳350

    0
  • IPS / inverter checkup

    About ৳500

    0
  • New wiring (per point)

    About ৳450

    0
Select one or more tasks above to see your instant labour range.

Safe Load Guide: How Many Fans & Lights Can Your IPS Run?

Never exceed 75% to 80% of your IPS rated load to prevent overheating, tripping, and premature battery failure.

  • 850VA to 1000VA IPS (~600 to 700W): 3 to 4 ceiling fans, 4 to 5 LED lights, and a Wi-Fi router.
  • 1500VA IPS (~1050W): 5 to 6 fans, 6 to 8 LED lights, a TV, and a router.
  • Never connect high-draw appliances like irons, geysers, rice cookers, or microwaves to standard IPS circuits.

5 Non-Negotiable Electrical Safety Rules for IPS Wiring

  • Use genuine 1.5 to 2.5 rm fire-retardant copper wire (e.g., BRB or BBS) for IPS input and main distribution lines.
  • Keep IPS phase wiring strictly isolated from grid phase inside switchboards to avoid dangerous back-feeding.
  • Install a dedicated 16A to 20A power socket and MCB breaker specifically for the IPS unit.
  • Verify proper home earthing so metal fan regulators or switches never tingle during backup mode.
  • Place the battery on a ventilated stand away from children and never next to a gas stove or spark source.

Simple Battery Care to Get 3 to 4 Years of Life

  • Check distilled water levels every 2 to 3 months on tubular or flat-plate batteries; never use tap water.
  • Clean white sulfate buildup from battery terminals and coat lightly with petroleum jelly.
  • Even if power stays steady, discharge the battery 30% once a month and recharge to keep the plates active.

Frequently Asked Questions

Modified or square-wave inverters cause fan motors to hum and heat up. Pure Sine Wave IPS units run fans silently and safely.

NID-verified pros · Pay after work

Need electrical at home?

Book in 30 seconds across Dhaka and all 64 districts. Inspect the quote first with ৳0 booking fee.